By providing your contact information to Sherri Blasingame, your personal information will be processed in accordance with Sherri Blasingame's Privacy Policy. By checking the box(es) below, you consent to receive communications regarding your real estate inquiries and related marketing and promotional updates in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. You may opt out of receiving further communications from Sherri Blasingame at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe.

Thank you for your message. I will be in touch with you shortly.

Explore My Properties

Old Town's Two-Permit Problem: What Changed in 2025 and What It Still Means for Buyers

September 3, 2026

A buyer who assumes the permit process on an Old Town house works the way it did a couple of years ago is already behind. Since March 10, 2025, the City of Key West has required anyone doing exterior work on a historic or contributing property to file for a Certificate of Appropriateness separately from the building permit application. Before that date, the two moved together under one submission, reviewed simultaneously behind the scenes. Most applicants never noticed there were two systems running at once. Now there are visibly two applications, two timelines, and two places the process can stall.

This matters more than a procedural footnote suggests. If you're comparing an Old Town listing to a house in Midtown or on the New Town side of the island, the median price gap between them isn't only square footage and walkability. Part of it is compensation for a regulatory queue that never shows up on a listing sheet, and the 2025 change is the clearest evidence yet of how that queue actually works.

What changed, specifically

Before March 2025, the City of Key West Building Department acted as a single intake point. Licensed plan examiners and the floodplain manager reviewed building permit applications, and if the property fell under historic jurisdiction, staff quietly routed the application to the Historic Preservation Department for a parallel review. Applicants interacted with one counter and got one outcome.

That changed on a Monday. A Certificate of Appropriateness now has to be applied for on its own, either in person at the permit technician desk at 1300 White Street or online through eTRAKiT. A building permit still confirms compliance with the Florida Building Code, the National Electrical Code, and the Florida Fire Prevention Code. The COA is a separate document entirely, issued by the Historic Architectural Review Commission, confirming that the same work meets the city's Historic Architectural Guidelines. One project, two applications, two approval clocks.

Before March 10, 2025 After March 10, 2025
Applications required One combined submission Two separate applications
Where reviewed Building Department routes internally to HARC Applicant files COA and permit independently
Visibility to buyer Low, process was bundled High, two distinct approvals to track

The number that should reassure you, and the one that shouldn't

Here's the part that gets buried in general HARC explainers: roughly 95 percent of Certificate of Appropriateness applications are approved at the staff level, according to the city's own COA guidance. That's a high clearance rate. Repainting in an approved color, replacing a rotted board with matching material, routine maintenance, most of it never reaches a public meeting.

The other number is the one that changes your timeline math. The Historic Preservation Division caps major projects at ten per monthly agenda. Once that limit is reached, additional major applications are typically pushed to the following month. HARC meets on the fourth Tuesday, once a month. Miss the cutoff for this month's agenda and you're not waiting a week. You're waiting until next month's meeting, and if that agenda fills too, the month after.

For most repainting and repair work, none of this matters. For an addition, a demolition, a change in height or mass, or elevating a structure out of the floodplain, it matters quite a bit. Those are precisely the projects most likely to require full commission review rather than a staff sign-off, and they're the same projects a buyer is often counting on to make an older Old Town house work for modern living.

What actually needs a hearing

The city's guidance draws a fairly clear line between what staff can approve on the spot and what needs to go in front of the seven-member commission.

  • Usually staff-level: routine maintenance, in-kind repair, repainting in a compatible color, minor fencing, solar panels positioned to minimize visibility from the street
  • Often commission-level: additions, demolitions, height and mass changes, elevating a structure above current grade, new construction on a historic lot
  • Case-by-case, depends on condition: window replacement, which hinges on whether the existing windows are assessed as historic and repairable or too deteriorated to save
  • Requires a specialist report first: repointing masonry, which the city says needs an architect or engineer to prepare a mortar and brick strength analysis before work begins

Notice what's on that middle list. Additions and elevation changes are two of the most common reasons a buyer takes on an older Old Town property in the first place, whether the goal is a second story, a rebuilt porch, or getting a low first floor further out of a flood zone. Those are exactly the projects most exposed to the ten-project monthly ceiling.

Why this shows up in the price, not just the paperwork

Old Town is not one price point. Zillow's typical home value estimate for the broader Old Town area sits above $1.2 million, but that figure hides real variation by pocket. Casa Marina runs well above $2 million. Truman Annex sits close to $1.9 million. Historic Seaport is in the high $1.6 million range. Bahama Village, still inside Old Town's boundaries, comes in under $1 million. Square footage and waterfront proximity explain a lot of that spread. The historic-district compliance burden explains part of what's left.

Homes in Old Town have also been taking noticeably longer to sell than the broader market, running somewhere around 111 days on a trailing twelve-month basis compared to a national norm closer to 53. Some of that gap is inventory type. Old Town's housing stock skews toward smaller, older, harder-to-replicate structures that don't move like a standard tract listing. But some of it is procedural. A buyer who wants to add a primary suite or raise a first floor has to build HARC's calendar into their financing and moving plans before they can trust a renovation budget, and agents who've walked that process know it can add weeks that a straightforward permit never would.

This is the piece a median price comparison can't show you. Two houses can list at the same number, one with a straightforward building permit path and one sitting on a contributing lot where any exterior change routes through a second application and, if it's a larger project, a monthly agenda with a hard cap. They are not the same purchase, even if the sale price says they are.

A sequence worth following before you write an offer

If exterior work is part of your plan for an Old Town property, a few steps early save real time later.

  1. Confirm whether the property sits inside the Historic District or is listed as a contributing structure outside it. Both trigger HARC jurisdiction.
  2. Ask what the previous owner has already had approved. Prior COAs and permits on file shorten your own review.
  3. Sort your planned work into likely staff-level versus likely commission-level before you get attached to a timeline. Painting and in-kind repair move fast. Additions, demolitions, and elevation do not.
  4. If your project needs a hearing, ask about the current month's agenda count early. Ten major projects fill a calendar faster than most buyers expect.
  5. Build the COA and building permit into your closing and renovation schedule as two separate line items, not one folded-in step.

Let's Connect

None of this makes Old Town a harder place to buy. It makes it a place where the paperwork behind the porch matters as much as the porch itself, and where the difference between a smooth renovation and a stalled one often comes down to timing decisions made before you ever submit an application. Key West Sherri works this process alongside clients on both sides of the historic-district line, from the first walkthrough to the closing table, and can help you read a listing with this friction already priced in. Let's Connect.